Customer information’s

Equipment receiving
If yes, take picture.
If yes, declare it on the delivery bill and take pictures.

Service and equipment validation

Equipment installation

Valid that shelfs are level (front to back(F/B) and right to left(R/L)) as per work instruction 7-0063.*


Equipment Start-Up
(RE4-8 or RE8-16 = 9A, RE4-12 or RE8-24 = 9 A, RE4-16 or RE8-32=12A)
Pressure must be between 5 and 12 inH2O (W.C.)
Pressure must be between 5 and 12 inH2O (W.C.)
-0.01 to 0.00 inH2O (W.C.) when the burner is lit on low fire.
Must be at least 2.0 µA on low fire.
RE4-8/RE8-16 = 400ml (13.5oz), RE4-12/RE8-24 = 500ml (17oz), RE4-16/RE8-32 = 2 x 400ml (2 x 13.5oz)
(start-up completed)